EM-MC – The Load Optimizer

The Maximum Controller EM-MC 2200 features a modern design as a comfortable power monitoring system to reduce peak loads with new additional functions. The setpoint power tracking dynamically adapts to the monthly operating behavior.

As a standalone device, the EM-MC 2200 is the ideal solution for small and medium-sized businesses, industrial operations, office buildings, and hotels. It can be integrated into the FRAKO Energy Management System via the FRAKO power bus or the Ethernet interface. Intelligent terminal shutoffs (Modbus over IP) or time controls are just a few of the helpful extensions of the EM-MC 2200. This investment quickly pays off in the liberalized energy market, as exceeding the set power limit continues to lead to avoidable costs.

Applications

Also interesting

PQA 1101

Measurement and monitoring device for acquisition, analysing, and monitoring all key electrical parameters in 3-phase low-voltage networks from 115 V to 690 V.

More Information

PQA 1500

Measurement and monitoring device for capturing, analyzing, and supervising all key electrical parameters in 3-phase low-voltage networks from 115 V to 690 V.

More Information
Scroll to top